GES Safer Streets

Project Overview

Denver's Department of Transportation & Infrastructure (DOTI) is committed to constructing safer, greener, and more accessible streets for everyone through the Globeville, Elyria, and Swansea (GES) Safer Streets project. We're building on the community's priorities to deliver safer and slower streets in the Globeville, Elyria and Swansea neighborhoods – improving safety for people walking, bicycling, scooting, rolling, and driving – between now and 2028.

These solutions will help to slow speeds, reduce cut-through traffic, make crossings safer, provide space for bicyclists/scooter riders, make bus stops accessible, and add more greenery to our streets.

Upcoming Project Outreach Events

GES Program of Projects Open House

  • Wednesday October 7, 2026

  • Heron Pond Open Space and Carpio-Sanguinette Park, Emerson St. and E. 51st Ave.

  • 3 - 6 pm

GES Safer Streets Pop Up

  • Friday October 16, 2026

  • Valdez Perry Library, 4690 Vine St, Denver, CO 80216

  • 10 am – 12 pm

    GES Safer Streets Meeting

    • Monday October 19, 2026

    • Globeville Recreation Center, 4496 Grant Street, Denver 80216

    • 3:30 - 5:30 pm

    GES Safer Streets Project Schedule English
    GES Safer Streets Project Schedule Spanish

    Why GES Safer Streets?

    Investing in transportation solutions in Globeville, Elyria and Swansea can help address historical inequities, environmental and public health challenges, and traffic safety concerns. These projects will enhance accessibility, support economic development, improve quality of life, and promote equity by prioritizing community needs, such as safer streets, better public transit, and environmentally-friendly designs.


    Focus Area

    GES project map from Broadway and 40th in the south to the border in the north, between Inca and Colorado

    Outreach Goals and Results

    Phase 3: Refine Designs (February–April 2026) and (Fall 2026)

    Goal: Consult with the community on specific project designs
    Graphic: 81 percent in support, 11 percent general feedback, 8 percent concerns  en espanol: 81 pct apoyaban la red popuesta
    What did you hear from the community during the third phase of outreach, in February, March, and April 2026?

    Thank you to everyone who shared feedback on safety and mobility solutions proposed through the GES Safer Streets project during February through –April, 2026! With support from our Community Based Outreach Partners, the GES Safer Streets project team attended a total of 9 events and spoke with more than 200+ individuals. We received over 150 survey responses providing support and feedback about the current improvement types and locations.

    What we heard from Phase III:
    • 81% of comments were in support of the proposed network, particularly:
      • Speed reduction measures
      • Increased comfort for walking and biking
      • Efforts to discourage cut-through traffic
    • 8% of comments had concerns about proposed solutions, particularly:
      • Desire for investment in other areas
    • 11% had other comments, focused on:
      • School zone enhancements
      • Inadequate street lighting
      • Lack of trees/greenery
      • Pavement conditions, particularly in Elyria
      • Unhoused population
    Survey Results At A Glance:
    • 156 Total Responses
    • 50% of Responses Recorded in Spanish
    • 92% of Participants Live or Work in GES
    • 81% of Participants are Excited About Proposed solutions
    • 26% of Participants Engaged in Previous Project Phases
    Key Quotes from Survey Participants:

    “I'm excited to have streets that reflect the makeup of the neighborhood - there are lots of people who live here! It's not just a cut-through for cars!”

    “Viajo por aquí y siempre hay carros con velocidades altas, ojalá esto mejore para que sea un lugar más seguro.” (I drive around here a lot, and there are always cars speeding. I hope this improves so it becomes a safer place.)

    “I agree with this change, it would be beneficial for youth and would help traffic control.”

    “Ojalá y la construcción avance pronto para que sea un lugar más seguro para los niños.” (Hopefully, construction will move forward soon so that it will be a safer place for children)

    “Slower speeds and more infrastructure keep our kids safe!”

    “Ojala y se hagan realidad las mejoras del vecindario.” (I hope the neighborhood improvements become a reality.)

    “These enhancements will create a safer environment for children to walk and ride their bikes; while also reducing unnecessary traffic in the area.”

    “I am very excited about the Swansea area improvements. I'm hopeful it will look cleaner, and more welcoming.”

    “Very grateful that safer cross street options are being installed for my friends.”

    “This will not only help speed but noise as well and air quality as well”

    Addressing Feedback

    The community raised some issues that are being addressed through the GES Safer Streets project or in partnership with other programs and departments such as 311 and the Curbside & Parking department, such as:

    • Moving ADA & Truck Route signage to improve accessibility and increase compliance
      • Construction: 2027
    • Constructing new sidewalks throughout GES funded by Elevate Bond
      • Construction: 2026 – 2027
    • Exploring safety solutions around Bruce Randolph School
    • Exploring solutions to connect people walking and bicycling to access the Platte River Trail at Washington St/Ringsby Ct
    What's Next

    The project team is incorporating feedback heard during this phase into construction-ready project designs, particularly:

    • Finalizing project designs and preparing for construction
    • Implementing additional requested solutions, where feasible, through work orders or integrating into project designs
    • Sharing feedback received about topics beyond the GES Safer Streets project scope with appropriate departments

    Stay tuned this fall for information about final designs and construction schedules!

    Phase 2: Develop Design Solutions (July-August 2025) & (October-November 2025)

    Goal: Collaborate with the community on how projects should look and feel to best address community needs

    In Fall 2025, the GES Safer Streets project conducted additional outreach in the Globeville community. This effort followed feedback gathered during the summer engagement phase, when community members expressed concerns about the impacts of certain proposed solutions in Globeville specifically, and on E 45th Ave in particular. In response, the project team revisited corridor concepts for:

    • Broadway (E 47th to E 52nd Ave)
    • Lincoln Street (E 44th to E 52nd Ave)
    • E 47th Ave (Lincoln St to Washington St)
    • E 45th Avenue (Broadway to Washington St)
    • E 44th Avenue (Broadway to Washington St)

    In October 2025, two opportunities for community input were offered on the proposed solutions: a pop-up event at Garden Place Academy and office hours at Prodigy Coffeehouse Globeville. In November 2025, the project team revised the potential solutions based on community feedback and presented them at a Garden Place Academy pop-up and through an online survey.

    What we heard from Fall Engagement:

    October Outreach

    • 45th Avenue is too fast, difficult to cross, and lacks consistent, visible, and protective infrastructure.
    • Support for speed humps, pedestrian refuge islands, curb extensions, four-way stops, greenery, and improved striping and visibility on 45th Ave.

    The proposed solutions were consequently revised based on community input.

    November Outreach

    • On 45th Avenue, participants supported the updated set of potential solutions including: enhancing key intersections with curb extensions incorporating additional greenery, median islands with pedestrian refuges, and reallocating the locations of speed humps.
    • In Globeville as a whole, community members expressed support for the revised solutions, noting that the updated designs addressed key concerns related to speeding and unsafe crossings. They also expressed support for the revised solutions and stated they appeared more balanced and appropriately scaled.

    Thank you to everyone who shared feedback on safety and mobility solutions proposed through the GES Safer Streets project this summer (July-August 2025)! With support from our Community Based Outreach Partners, the GES Safer Streets project team attended a total of 12 events and spoke with more than 100+ individuals. We received 500+ unique, location-specific comments that will be directly integrated into project designs.

    What we heard from Phase II:
    • 63% of comments were made in support of the proposed network of street solutions, particularly:
      • Proposed corridors matching top community priorities
      • Speed reduction measures
      • Increased comfort for walking and biking
    • 14% of comments had concerns about proposed solutions, particularly:
      • Some solutions suggested along corridors in Globeville
    • 23% had other comments, focused on addressing:
      • Stop sign running
      • Freight cut-through traffic
      • Inadequate street lighting
      • Speed management
      • Better connections to Argo Park
      • Unhoused population
    map of GES phase II feedback locations
    Graphic: majority strongly or somewhat support Graphic en espanol: fuertemente y algo de apoyo

    Key takeaways about possible solutions include:

    • Support for speed mitigation, crossing improvements, and improved connectivity
    • In Globeville along Lincoln St, 45th Ave, and 44th Ave, concern regarding curb extensions and pedestrian refuge islands
    • Support for an improved bicycle network, particularly with connections into and out of the neighborhoods
    • Desire for vehicle drag racing and freight cut-through traffic to be addressed
    • Support for green infrastructure so long as it is well-maintained
    • Desire for improved personal safety, such as street lighting, and concern regarding unhoused populations in the neighborhoods A range of preferences for the potential Local Bus Rapid Transit alignment through GES, with no specific alignments strongly preferred or opposed.
    What next?

    The project team is incorporating feedback heard during this phase into refined project designs, particularly:

    • Moving priority projects ahead to final design
    • Working with community to understand issues and change project elements before advancing design further
    • Identifying additional projects if needed and sharing other concerns with appropriate departments

    Phase 1: Prioritize Community Needs (February-April 2025)

    Goal: Build on past planning work and collaborate with the community to prioritize and phase projects to build

    Thank you to everyone who shared feedback on priority streets and your specific travel needs with the GES Safer Streets project this spring (February-April 2025)! With support from our Community Based Outreach Partners, the GES Safer Streets project team attended a total of 14 events (see Public Outreach section below) and spoke with more than 250+ individuals. We received 675+ unique, location-specific responses that will directly inform the design of safety solutions that grounded in the community's real-world experiences.

    What we heard from Phase 1:
    • The top three concerns identified through the feedback map account for 58% of all feedback received:
      • 25% Speeding
      • 17% Traffic
      • 16% Pedestrian and Bike protection
    • Only 11% of responses mentioned hot/icy conditions and flooding
    • 10% of responses did not fit into existing categories
    • The NDSS Safer Streets project name could be revised to improve clarity.
    Location map of Globeville-Elyria Swansea area

    Survey results showing areas of concern from Globeville-Elyria Swansea residents with speeding and traffic highest Survey results showing areas of concern from Globeville-Elyria Swansea residents (in Spanish)

    In our second phase of outreach (June 2025), the GES Safer Streets project team will ask for your feedback on proposed solutions to your streets based on the most common concerns we heard and safety data we gathered. Proposed solutions range from adding speed cushions to slow traffic, making crossings safer, adding greenery along the streets, and more. Construction of these solutions is expected to occur in 2027 and 2028.

    New name. Same objective.

    In Phase 1 of our outreach, we heard feedback that the project's name, North Denver Safer Streets, was leading to confusion and didn't align with how the community refers to itself.

    The City is dedicated to communicating with GES neighbors on their terms, which is why we are changing the name of the project to GES Safer Streets.

    Past and Future Outreach Events

    Fall 2026 — Outreach Events Upcoming!

    GES Program of Projects Open House

    • Wednesday October 7, 2026

    • Heron Pond Open Space and Carpio-Sanguinette Park, Emerson St. and E. 51st Ave.

    • 3 - 6 pm

    GES Safer Streets Pop Up

    • Friday October 16, 2026

    • Valdez Perry Library, 4690 Vine St, Denver, CO 80216

    • 10 am – 12 pm

    GES Safer Streets Meeting in Globeville

    • Monday October 19, 2026

    • Globeville Recreation Center, 4496 Grant Street, Denver 80216

    • 3:30 - 5:30 pm

    Phase 3: Refine Designs (February, March and April 2026)

    February, March & April 2026
    • Wednesday, February 25, 4:30-7 pm, National Western Center Community Advisory Committee Meeting, 5115 Race Ct.
    • Monday, March 2, 5-6:30 pm, 5090 Broadway Recreation Center Pop Up, 5090 Broadway
    • Tuesday, March 3, 5:30-7:30 pm, Swansea Recreation Center Pop Up, 2650 E 49th Ave
    • Wednesday, March 11, 5:30-7:30 pm, The Triangle at National Western Center Meeting, 4777 National Western Dr
    • Thursday, March 12, 5:30 - 7 pm, Johnson Recreation Center Pop Up, 4809 Race St
    • Saturday, March 14, 10 am - 2 pm, Panadería Emmanuel Event, 500 E 45th Ave
    • Wednesday, March 18, 10 am - 2 pm, Valdez-Perry Library Event, 4690 Vine St
    • Wednesday, April 8th, 5:30pm – 7:00pm, Lorraine Granado Park

    Phase 2: Develop Design Solutions (June 2025) (July 2025) (October and November 2025)

    October & November 2025

    Thank you for all your feedback this spring and summer on possible street solutions in your neighborhoods! Based on what we heard, 13 corridors in Globeville, Elyria, and Swansea are moving into design. We also heard that we need to do more work on the following corridors in Globeville to meet your needs:

    • E 45th Ave between Broadway and Washington St
    • N Broadway between E 52nd Ave and E 47th Ave
    • N Lincoln St between 52nd Ave and E 44th Ave
    • E 44th Ave between Broadway and Pearl St

    We want to hear the types of safety and mobility solutions you prefer and where you would like them placed.

    Explore Safety Solutions

    • Thursday, October 23, 12:15pm – 1:45pm, Garden Place Academy Pop Up, 4425 Lincoln St
    • Sunday, October 26, 9am – 1pm, Drop By Office Hours, Prodigy Coffeehouse Globeville, 4500 Broadway

    Review Preferred Safety Solutions

    • Thursday, November 6, 12:15pm – 1:45pm, Garden Place Academy Pop Up, 4425 Lincoln St.

    July 2025

    Thursday, July 17, 2025

    • Public Open House
    • 5:30 p.m. - 7:30 p.m.
    • Argo Park
    • 4700 Logan Street, Denver, CO 80216

    Thursday, July 10, 2025

    • 3:00 p.m. - 5:00 p.m.
    • El Tepetate Market
    • 4555 Thompson Ct., Denver, CO 80205

    Saturday, July 12, 2025

    • 10:00 a.m. - 2:00 p.m.
    • People's Market at the Center (UCAN/ CSU Spur) River Festival
    • 4797 National Western Drive, Denver, CO 80205
    Meeting recording July 2025

    June 2025

    Thursday, June 12, 2025

    • Special in-person GES CAG workshop to provide feedback on transportation solutions to the Globeville, Elyria, and Swansea (GES) Safer Streets project team.
    • 6:00 p.m. - 7:30 p.m.
    • Johnson Recreation Center
    • 4809 Race Street, Denver
    • Light refreshments will be served

    Friday, June 13, 20, 27, 2025

    • 2:00 p.m. - 5:00 p.m.
    • Huerta Urbana Farmers Market
    • 2501 East 48th Avenue; Denver, CO 80205

    Wednesday, June 25, 2025

    • 6:30 a.m. - 9:00 a.m.
    • Bike To Work Day
    • South Platte River Trail (between 51st & 52nd Avenue)
    • Food, beverages, and give away items

    Phase 1: Prioritize Community Needs (October 2024) (January 2025) (February 2025) (March/April 2025)

    March & April 2025

    Tuesday, March 4, 2025

    • 12:00 p.m. - 2:30 p.m.
    • Mobile Food Market, We Don't Waste
    • Bruce Randolph School
    • 3955 Steele Street, Denver, CO 80205

    Video Recording: project overview video

    Thursday, March 6, 2025

    • 5:30 p.m. - 7:30 p.m.
    • Mayor's Bicycle Advisory Committee
    • virtual meeting

    Saturday, March 8, 2025

    • 10:00 a.m. - 2:00 p.m.
    • CSU Spur Girls and Science
    • 4817 National Western Drive, Denver, CO 80216

    Monday, March 10, 2025

    • Swansea CASR design meeting

    Tuesday, March 11, 2025

    • Mayor's Pedestrian Advisory Committee Meeting

    Thursday, April 3, 2025

    • 5:00 p.m. - 7:00 p.m.
    • Public Open House
    • Johnson Rec Center
    • 4809 Race Street, Denver, CO 80216

    February 2025

    Monday, February 24, 2025

    • 2:00 p.m. - 4:30 p.m.
    • Birdseed Collective weekly food box distribution
    • Globeville Community Center
    • 4496 Grant Street, Denver, CO 80216

    Thursday, February 27, 2025


    January 2025

    The project team provided an update on the project to the Globeville Elyria Swansea Community Action Group (CAG) at a virtual meeting on January 29, 2025.

    Click below to watch the virtual meeting and hear which projects the team has identified as priority investments and how community members can get involved in the project. The GES Safer Streets (formerly NDSS) presentation begins at timestamp 1:10:32.


    October 2024

    The project team provided an overview of the project to the Globeville, Elyria, and Swansea Community Action Group (CAG) at a virtual meeting on October 24, 2024.

    Click below to watch the virtual meeting and learn more about the team's approach and goals. The GES Safer Streets (formerly NDSS) presentation begins at timestamp 11:09.


    Frequently Asked Questions

    What is the GES Safer Streets project?

    Denver's Department of Transportation and Infrastructure (DOTI) is responsible for all public improvements in the City — including everything from streets to sewers, sidewalks to traffic lights.

    DOTI is leading a new effort called GES Safer Streets, which will build solutions along priority streets to make them safer and more accessible for everyone in the Globeville, Elyria, and Swansea neighborhoods. DOTI will use a community driven process that co-creates solutions and build projects that improve safety and access for people walking, bicycling, scooting, rolling and driving — between now and 2028.

    Why GES Safer Streets?

    DOTI has heard and understands traveling in GES is challenging — options for getting around are limited, major barriers exist, and travel can be uncomfortable, especially on busier streets or streets with lots of truck traffic. Making travel better in Globeville, Elyria, and Swansea can help address historical inequities, environmental and public health challenges, and traffic safety concerns. Projects built through GES Safer Streets will enhance access, support economic development, improve quality of life, and promote equity by prioritizing safer streets, better public transit, and make cooler streets that also drain water better.

    What kinds of transportation changes will this project bring to Globeville, Elyria, and Swansea?

    Transportation solutions that the Globeville Elyria and Swansea Safer Streets project will bring to the area include slowing speeds, reducing cut-through traffic, adding crosswalks and making crossings safer, providing space for bicyclists/scooter riders, making bus stops accessible, and adding more greenery to our streets.

    What are some of the GES Safer Streets project goals?

    Some of the project goals include:

    • Co-creating and building solutions that address the most pressing travel needs in collaboration with the GES community.
    • Building on community feedback in Globeville, Elyria, and Swansea to address transportation priorities, improve connectivity and find creative solutions to local needs.
    • Building smaller solutions that meet the community's travel needs within three years.
    • Starting bigger projects, such as exploring a new bus route, that will be built later.

    Where is the project located?

    Projects will be built within the GES neighborhoods, bounded by an area that runs north to south along Inca Street between East 52nd Avenue and Park Avenue and East 54th Avenue to East 40th Avenue, and west to east along I-70 from Inca Street to Colorado Boulevard. GES Safer Streets is seeking to focus investments along the streets prioritized by the community in recent years that need changes most (highlighted in blue in the map below) - though we will be collecting feedback about the travel around the entire area, as well as travel in-and-out.

    North Denver Safer Streets map

    What is the project timeline and milestones?

    project timeline english July 2026.jpg
    Project timeline spanish July 2026.jpg

    What are some of the other DOTI project that GES Safer Streets will tie into?

    Some of the other DOTI projects that GES Safer Streets will tie into include:

    How will GES Safer Streets support the Globeville, Elyria, and Swansea Program of Projects?

    The GES Safer Streets project is one of several active DOTI projects in the GES area. The City is doing a lot of construction work in GES and has grouped information about these projects into a bucket called the GES Program of Projects. This will help make it easier to learn about all the city project happening now in the neighborhood, in one place. Projects in this program include:

    • 48th Avenue Greenway and Outfall
    • 51st Avenue: Logan Street to Emerson Street
    • Globeville Levee Improvements
    • Carpio-Sanguinette Park and Heron Pond Open Space
    • Lincoln/I-70 Underpass Pedestrian Improvements Project
    • Pedestrian/GES Sidewalk Improvements
    • Washington Street Final Design: 47th Avenue to 52nd Avenue

    To learn more about the GES Program of Projects and to view a map, visit bit.ly/gesprojects.

    What kinds of solutions will be installed?

    The images below show the types of street safety and access solutions that will be built through GES Safer Streets. These changes will be prioritized along specific streets to create a network of routes that make it easier to walk, bike, access transit, and drive across the neighborhoods.

    Collage of types of street safety and access improvements that will be built through NDSS.

    Full Size Image(JPG, 295KB)

    How are the solutions being paid for?

    GES Safer Streets project solutions are being paid for through different funds. These include:

    • Capital Improvement Program – Funded via taxes in Denver to improve transportation, these funds will be used to build street safety solutions, pedestrian crosswalks, make bus stops more accessible, and plan transit solutions along 48th Ave.
    • Bond Funds – A portion of the 2021 RISE bond – voted on by Denver residents – will be used to build solutions in GES that make streets slower and safer for everyone.
    • Federal Grant Funds – The City was awarded Federal Grant Funds – via the Transportation Improvement Program (TIP) – will be used to build solutions in GES that make streets slower and safer for everyone.
    • Wastewater Enterprise Fund – A fee properties are assessed will be used to build green infrastructure solutions.

    The City is combining these funds so that we can rapidly build projects in the community all at one, as well as start bigger projects so that we can move them forward to being built.

    How will projects be chosen and prioritized?

    GES Safer Streets is starting with a map of priority streets, identified by the community through past planning efforts. Using this map, GES Safer Streets will first seek feedback about which of these streets – or portions of streets – are most important to make changes to, or if there are any streets not highlighted in the map that represent priorities.

    Since we have limited funds – the streets, or street portions, that are identified through community outreach as the most in need of changes will be prioritized for solutions. The types of changes made to streets will vary based upon the diverse street types in the neighborhoods – and will be co-created with the community once the street locations to improve are identified.

    How can I get other people involved with the project?

    DOTI will engage Globeville, Elyria, and Swansea residents to verify and prioritize the planning and design of solutions through public meetings, neighborhood events, surveys and community conversations.

    For questions, email DOTI.GES@denvergov.org or call the project hotline at (720) 865-2806.